- Depth (Inches):
- 9.00
- Weight (LBS):
- 0.45 LBS
- Height (Inches):
- 1.00
- Width (Inches):
- 4.00
- UPC:
- 065537865188
- Catalog: Catalog
- Specification Sheet: Specification Sheet
- Country of Origin:
- CN
- Part Number Keywords:
- 005TPC-S ; 005TPCS ; 065537865188 ; 06553786518 ; 65537865188
- Keywords:
- 005TPC-S 005TPC Flextime High Performance Cut-Resistant Gloves, S, Spandex/Thermoplastic Rubber, Resists: Cut, Impact, Puncture and Water, ANSI Cut-Resistance Level: A5, ANSI Puncture-Resistance Level: 4 ; Watson Gloves ; Work Armour ; 005TPCS ; 0655
SKU
Watson 005TPC-S Work Armour 005TPC Gloves S Leather Goatskin
EACH
34.01CAD